The high Dam at Aswan was completed in 1970.
阿斯旺的高坝是于1970年完工的。
"Before they started the High Dam 25 years ago," he said, "the Nile mud had a lot of food in it, and so the sardines gathered near the mouth of the river to feed."
他说“二十五年前修建高坝之前,尼罗河的泥沙里有很多可吃的东西,所以沙丁鱼就聚集在河口找食吃。”
It is difficult to build a dam in the sea, and the cost is very high.
在海里建水坝十分困难,成本也很高。
The first new design was by Alexander Gorlov, a Russian civil engineer who worked on the Aswan High Dam in Egypt.
第一个新设计是俄罗斯的土木工程师亚历山大.佐罗夫完成的,他先在埃及的阿斯旺大坝工作,后来移居到美国。
Where damage has been identified, it has been cracking high in the dam and where additional features such as curbs, railings, gates, or guard or control houses are located.
在大坝确认收到破坏的部位,大都是在较高部位出现裂缝,那里的特点是附设有连接装置,护栏,泄水闸门,警卫室或控制室等。
This can be attributed, in part, to the fact that any cracking caused by the earthquake has mainly been horizontal and located high in the dam together with the reservoir not being full in many cases.
这是因为地震引起的裂缝主要是水平方向的,而且位于大坝的高处,水库一般都不是足量蓄水。
The authors determined that Miyatoko Dam (see Figure 10), a 48m (157ft) high RCC dam was located approximately 13km (8 miles) north of Sendai.
作者肯定地说,高48米的滚筒实压混凝土宫北大坝(见图10)大约在千代以北13公里。
Thirty years later Gamal Abdel Nasser had to make a new treaty with Sudan in order to build the Aswan high dam.
30年后,纳赛尔不得不与苏丹签订新条约,以建立阿斯旺高坝。
The remaining portion of the dam adjacent to the damaged area also experienced high accelerations and separated from its foundation bedrock.
与大坝受损位置相邻的其他部分也同样受到高加速冲击,脱离了地基的岩体。
The dam wall is 870 ft. (265 m) high - taller than the Hoover dam - and when completed, the dam formed a reservoir 47 miles (75 km) long that completely submerged the old town of Tehri.
大坝高870英尺(265米)——比胡弗大坝高——竣工以后,该大坝形成了一个长达47英里(75千米)的蓄水池,完全是老的特赫里城镇完全陷入水中。
They were formed in the 1990s by diverting water from lake Nasser, an artificial lake formed behind the Aswan High Dam on the river Nile.
它们是由于1990年代从纳赛尔湖调水而形成的,是在尼罗河上的阿斯旺大坝后面形成的人工湖。
The 156-meter-high Zipingpu Dam began to fill in December 2004, and within 2 years the water level had risen to 120 meters.
高达156米的紫坪铺大坝于2004年12月份开始蓄水,两年内水位已经涨到了120米。
It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.
据推论最大可能性是在那一时间段非线性水压作用于坝体上游面所造成的差别。
There is only one way to appreciate the scale of Egypt's monumental Aswan High Dam, and that is by standing directly on top of it.
欣赏阿斯旺大坝的壮美只有一个办法,那就是登上坝顶。
Two other concrete gravity DAMS, the 73.5m (341ft) high Sugesawa dam and the 14m (46ft) high Uh DAMS were also located close to the earthquake epicenter.
另外两座混凝土重火力大坝,73.5米高的茂泽大坝和14米高的乌赫大坝也位于震中附近。
37a section of Lake Nasser in Egypt, a massive reservoir behind the Aswan High Dam on the Nile River, seen from the International Space Station in January of 2010.
2010年1月份,国际空间站上拍摄到的埃及纳赛尔湖,这座尼罗河阿斯旺大坝上的大型水库。
Kasho, a 46.4m (152ft) high concrete gravity dam was shaken by the 6 October 2000 Western Tottori Earthquake (M 7.3) in Japan. The epicenter of the earthquake was about 3km (1.9 miles) from the dam.
家所大坝是一座高46.4米的混凝土重力坝,在2000年10月6日受到日本西鸟取县7.4级地震的影响,震中离大坝3公里。
Her hosts held a festive celebration, then showed her the dam, an eight-foot-high sand-and-concrete structure that traps and filters water so that it's available and drinkable year-round.
接待她的主人举行了节日庆典,然后,带她看了水坝——八英尺高的沙和混凝土结构,圈住并过滤能够全年供应的饮用水。
According to Rees, this recycled water arrangement, combined with the desalination plant, will ensure the city’s dam levels, which are currently just below 60%, will remain high.
据Rees说,这个再生水厂同海水淡化长一起配置,将保证悉尼市的大坝储水量。
If the first mesh too protruding layout will make itself, the stress is too high, seriously interfere with the flow of water, causing problems for each dam after the defense.
如果第一座格宾网布设得过长凸出,将使本身受力过大,严重干扰了水流,给以后各个坝的防守造成了困难。
After 11 years of construction, the Aswan High Dam in Egypt is completed.
历经11年的修建后,埃及的阿斯旺水坝竣工完成。
Furthermore, model test of Xiluodu's high arch dam is studied and the. Result of stress and displacement is presented in this paper.
此外,本文对溪洛渡高拱坝进行了应力模型试验研究,给出了试验得到的应力、变位结果。
Furthermore, model test of Xiluodu's high arch dam is studied and the. Result of stress and displacement is presented in this paper.
此外,本文对溪洛渡高拱坝进行了应力模型试验研究,给出了试验得到的应力、变位结果。
应用推荐