Out of Phase Shunting of large turbo generator sets is an often met with fault in power systems, which constitutes a vital factor effecting safe operation of the set.
非同期并列是大型汽轮发电机组常见的电力系统故障之一,对机组的安全运行甚为关键。
This paper discusses the performance of the conventional alternative exciter— rectifier excitation system of the domestic turbo-generator set.
本文讨论了国内汽轮发电机组常用的交流励磁机—整流器励磁系统的运行特性。
The method of -pole assignment for multivariable systems by output feedback and its application to the design of integrated controller of large turbo-generator set are discussed in this paper.
本文讨论了如何利用输出反馈配置极点的方法设计大型汽轮发电机组综合控制系统的问题。
This paper describes a new approach to the design of coordinated controller of turbo-generator set using multivariable frequency-response control theory.
本文叙述用多变量频率域控制理论设计汽轮发电机组协调控制器的新方法。
In this paper a general study has been made for application of the modal synthesis technique to combined vibration analysis for the rotor-bearing-foundation system of a large turbo-generator set.
本文就如何把模态综合技术应用于大型汽轮发电机组转子-轴承-基座系统的联合振动分析作了一般性探讨。
The reformation scheme of capacity expansion for 50mw turbo-generator set and the operation condition after the reformation have been introduced.
介绍50MW汽轮发电机组的增容改造的实施方案及运行情况。
Abstract: the reformation scheme of capacity expansion for 50mw turbo-generator set and the operation condition after the reformation have been introduced.
摘要:介绍50MW汽轮发电机组的增容改造的实施方案及运行情况。
Abstract: the reformation scheme of capacity expansion for 50mw turbo-generator set and the operation condition after the reformation have been introduced.
摘要:介绍50MW汽轮发电机组的增容改造的实施方案及运行情况。
应用推荐