• You can create a data generation plan that creates meaningful data and then link it to a unit test.

    可以创建一个生成有意义数据的数据生成计划然后将该计划链接单元测试

    youdao

  • Responsible for unit, module, integration and system testing including preparation of test cases, execution of test plan, verification and reporting of test results.

    负责单元模块综合系统测试包括:开始程序测试执行计划的测试、运行结果更正报告

    youdao

  • This paper proposes a practical plan for a unit with functions of spectrum monitoring, self-excitation detection and isolation degree test, which is suitable for current wireless relay station.

    提出一种实用应用现有无线通信直放站的具有频谱检测、自检测隔离测试功能单元设计方案

    youdao

  • If you run database unit tests now, the data generation plan populates the database one time, at the start of your test run.

    如果现在运行数据库单元测试,则数据生成计划测试运行开始时一次性填充数据库。

    youdao

  • As part of your unit tests, you might generate test data by running an existing data generation plan.

    进行单元测试时,也可以执行资料产生计划产生测试资料。

    youdao

  • Generate test data prior to running unit tests check box to apply a data generation plan to your database project before you run tests.

    运行单元测试生成测试数据复选运行测试数据库项目应用数据生成计划

    youdao

  • You can define unit tests to verify the behavior of your database objects and associate each test project with a different data generation plan, deployment configuration, and connection string.

    可以定义单元测试验证资料库物件行为以及一个测试专案不同资料产生计划部署组态连接产生关联。

    youdao

  • Create a data generation plan: Create a data generation plan for each unit test project or for specific application tests.

    生成测试数据:预览并验证将生成的数据之后,您可以运行数据生成计划生成测试数据。

    youdao

  • Create a data generation plan: Create a data generation plan for each unit test project or for specific application tests.

    生成测试数据:预览并验证将生成的数据之后,您可以运行数据生成计划生成测试数据。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定