• Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.

    通过厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述水下捆绑爆破法工艺原理方案设计实施效果

    youdao

  • Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.

    通过厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述水下捆绑爆破法工艺原理方案设计实施效果

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定