• By using field observation and numerical simulation method, the influence of fracture structure plane on the underground pressure and the roof stability of working face are systematically studied.

    通过现场观测数值模拟分析系统研究断裂结构面对回采工作面分布和顶板稳定性影响

    youdao

  • The lag distance of abutment pressure behind working face increases, but the convergence coefficient of vertical stress doesn't change obviously with the increase of mining height.

    分层开采与综放开采工作面滞后支承压力变化规律是,随着采高增大,工作面滞后支承力距离加大,垂直应力集中系数差别不大。

    youdao

  • Seal chamber pressure of a new double spiral groove face seal working under high velocity and pressure conditions may probably be disturbed in operation, which affects the seal stability.

    一种用于高速高压等极端工况新型双螺旋端面密封实际运行过程中密封压力会出现波动从而影响密封稳定性。

    youdao

  • Accordingly, the distribution of abutment pressure on the block coal pillar is measured at working face with a steeply inclined seam of the12010 face, NO.

    据此原理,实测得到平煤集团十三矿12010大倾角综放开采工作面走向支承压力区段煤柱侧向支承压力分布

    youdao

  • Thus it can been seen that enhancing the top monitoring during the period of the pressure change of working face has important practical meaning to security in coal mine.

    由此可见工作面期间加强顶板监控煤矿安全生产具有重要现实意义

    youdao

  • Based on analysis of working face, we attempt to explain the mechanism of pressure on mine gas outburst face some, and suggest some prevention and cure Suggestions.

    文章通过工作面的分析尝试性解释对工作面煤与瓦斯突出部分机理提出几点防治建议。

    youdao

  • Introduction: now working pressure is more and more big, the white-collar workers face computer for a long period of time, if not to exercise, will inevitably lead to shoulder pain.

    简介现在工作压力越来越使得白领们时间的面对电脑如果加以运动,难免导致肩膀酸痛。

    youdao

  • Finally, the coal-rock mass in the arch angle and apex is slided, and causes the distortion of local rock pressure, even induces dynamic hazards around working face.

    拱顶岩滑落失稳,造成工作面局部压力畸变并诱发动力学灾害

    youdao

  • The author briefly introduces the principle, working face testing and application, effectiveness analysis and Suggestions on outburst control for high pressure grinding water jet technology.

    作者简要介绍高压磨料射流技术防突原理工作面试验应用效果分析建议

    youdao

  • The roof management, roof pressure computing, assurance coefficient checking are introduced. Three kinds of protecting methods of working face management are expounded.

    顶板管理、顶板压力计算安全系数校核方面进行了介绍,并且在大倾角工作面措施管理方面进行了详细的阐述。

    youdao

  • According to the fieldwork experimentation, after adopting the high-pressure water injection technology, the width of the stress-relaxed zone at the front of the working face increases form 2.

    现场试验结果表明:采取高压注水工艺工作面前方煤体卸压宽度2

    youdao

  • Author introduces the structure and the working principle of the secondary dust removal device with negative pressure as well as the application to fully mechanized mining face in Shuoli colliery.

    介绍综采割煤二次负压降尘装置结构工作原理以及朔里煤矿综采工作面使用情况

    youdao

  • An example provided in the case of wind is increased, which shows the dynamical balance feature between the air pressure in working face and gas pressure in the goaf.

    给出增大风量瓦斯分布算例由此反映工作面风压采空区内部瓦斯压力动态平衡性

    youdao

  • The testing results of working face coal samples and roof impact tendency indicated that the coal seam belongs to high impact tendency and has pressure bumping possibility.

    工作面顶板冲击倾向性测试结果表明煤层属于冲击倾向性煤层,具有发生冲击矿压的能力。

    youdao

  • The testing results of working face coal samples and roof impact tendency indicated that the coal seam belongs to high impact tendency and has pressure bumping possibility.

    工作面顶板冲击倾向性测试结果表明煤层属于冲击倾向性煤层,具有发生冲击矿压的能力。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定