在施工中进行各工序书面技术交底,参加各工序的检验和工程验收,对工程的分部分项工程进行质量检查和评定工作。
Written technical disclosure of each process in the construction, to participate in the inspection and project acceptance process, quality inspection and assessment of sub projects.
公伯峡水电站引水发电工程已具备蓄水条件并通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。
The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.
公伯峡水电站引水发电工程已具备蓄水条件并通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。
The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.
应用推荐