本文介绍了广东大亚湾核电站在此方面的管理经验。
This paper introduces the managerial experience of Guangdong Daya Bay PNS on this aspect.
在确保大亚湾核电站安全运营的前提下,加快施工进度。
In premise of assuring the safety of Daya Bay nuclear power station, the construction speed can be increased.
我是大亚湾核电站安监会成员,可在各个管理层级自由出入。
I served on a safety oversight board at the Daya Bay plant, and we had free access to the facilities, including all levels of management.
同时简要介绍了大亚湾核电站的培训管理组织机构和培训设施。
At the same time, the training management organization and training facilities of Daya Bay NPP are briefly introduced.
针对大亚湾核电站1号机组在并网过程中出现的故障进行了分析说明。
That the fault occurred in the synchronization process of Daya Bay Nuclear Power Station unit 1 is also analyzed and illustrated.
同时并承担向大亚湾核电站提供了数以千计的备品备件的制造及供应任务。
Meanwhile, we assumed the manufacture and supply for thousands of Repair Pieces and Awaiting Parts to Daya Bay Nuclear Power Plant.
本文介绍了大亚湾核电站调试锅炉工程总体布置和系统设计以及实施效果。
This paper briefly describes the general layout and system design of preoperational test boilers of Daya Bay Nuclear Power Station and the economic benefits attained therefrom.
描述了贯穿于广东大亚湾核电站日常工作组织过程始终的风险分析的概念和方法。
The work organizing process integrated with risk analysis of Guangdong Daya Bay Nuclear Power Station (GNPS) is depicted.
该方法已在大亚湾核电站18个月换料项目的提高堆芯功率因子的分析论证中应用。
The DRM has been used for justification of increasing core power factor in Daya Bay NPS18-month fuel cycle project.
结果表明,大亚湾核电站采用18个月换料之后,在中小破口失水事故时仍有较大安全裕量。
The results show that the large margin is obtained in Guangdong Nuclear Power Plant with 18-Months fuel cycle.
如果人人坚持这样做,全国每年可省电180亿度,相当于三座大亚湾核电站年发电量的总和。
If everyone keeps on doing this, we can save 180 billion KWH in nationwide which equals the total annual power generation of three Daya Bay Nuclear power Stations.
大亚湾核电站第十循环堆芯是自提高燃料组件富集度后实现18个月燃料循环的第二个循环堆芯。
The tenth cycle core of GNPS is the second cycle with 18-month fuel cycle after increasing fuel enrichment.
介绍了大亚湾核电站堆芯换料设计准则、计算机程序、设计内容以及设计预计值与测量值的比较。
The design criteria, codes, basic principles and contents of the reload design for Daya Bay Nuclear Power Station are briefly introduced.
大亚湾核电站从第九循环开始由年换料向18个月换料转换,使得原堆芯热工水力设计不再适用。
GNPS begins to implement the 18-month fuel cycles from the initial annual reload at cycle 9, thus the initial core thermal hydraulic design is not valid any more.
分别以循环长度、功率峰因子和卸料燃耗为目标函数,应用遗传算法对大亚湾核电站首炉装载进行优化。
The code was employed to optimize the cycle length, the peak power factor and the discharge burnup of the first cycle loading for the Daya Bay Nuclear Plant.
大亚湾核电站两台机组在进入18个月换料之后,原来用一维程序计算的刻度曲线出现了越来越大的偏差。
As Daya Bay nuclear power station has entered the 18-month fuel cycle, the bias of calibration curve from 1d code is growing larger.
采用ME LCOR程序比较了大亚湾核电站在全厂断电事故下,恢复供电后不同喷淋模式对事故进程的影响。
The effects of different spray models on the accident progress after the power recovery at blackout accident in Daya Bay Nuclear power Plant were compared by MELCOR code.
摘要:大亚湾核电站及岭澳核电站目前共有各种泵组3000多台,其中A SG辅助给水泵系统属于核安全设备。
Abstract: Daya bay and ling ao nuclear power plant at present there are various kinds of pump group of more than 3000 units, the ASG auxiliary feed water pump issue belongs to nuclear safety.
介绍了主控室报警处理计算机辅助系统的设计思想、开发环境、功能流程以及该功能在大亚湾核电站主控室的实施应用情况。
The design ideology, exploring environment, the function flowing of the real time alarm process computer aided system and it 's application in Daya Bay Nuclear Power Station are introduced.
全面回顾了大亚湾核电站培训体系的建立过程,重点阐述了具有大亚湾核电站自身特色的授权培训制度和运行人员培训体系。
The setup of Daya Bay NPP training system with an emphasis on Daya Bay NPP's authorization training system as well as operational personnel training system is reviewed.
依赖于专家知识建立了大亚湾核电站和秦山第二核电厂换料堆芯装载知识库,在此基础上进行换料堆芯装载方案启发式优化搜索。
The expert knowledge library for Daya Bay and Qinshan phase II NPP has been established based on expert knowledge, and the reload core loading pattern heuristic search is performed with this library.
简要回顾了切尔诺贝利核电站事故的影响和教训,结合广东大亚湾核电站放射性物质的排放情况和运行经验,提出有关核电安全建设的建议。
The information of nuclear accident in the Chernotyl power plant was described and the radioactive waste release and the operation experience in GNPS were recommended.
大亚湾核电站由年换料改为18个月换料,燃料组件由AF A2g改为afa3g,堆芯中子学参数发生了较大变化。因此,需要对许多事故重新进行分析。
The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.
作为核能制造技术方案的提供者,我们正在致力于中国的发电事业:我们向大亚湾和岭澳核电站提供了核能反应堆。
As a provider of solution to produce nuclear energy, we are contributing to generate electricity in China: we have supplied nuclear power reactors in Daya-Bay and Ling-Ao.
介绍了大亚湾和秦山一期核电站蒸汽发生器清洗前、后的目视检查。
It describes the visual inspection generator of steam con in Daya Bay and Qinshan INPPbefore cleaning and after cleaning.
从20年前中国第一个大型核电站大亚湾工程以后,阿尔斯通就已是CGNPC和东方电气的工业合作伙伴。
Alstom has been CGNPC's and Dong Fang's industrial partner, since the construction of Daya Bay, the first large Chinese nuclear power plant, 20 years ago.
从20年前中国第一个大型核电站大亚湾工程以后,阿尔斯通就已是CGNPC和东方电气的工业合作伙伴。
Alstom has been CGNPC's and Dong Fang's industrial partner, since the construction of Daya Bay, the first large Chinese nuclear power plant, 20 years ago.
应用推荐