• 金沙江流域水电梯级开发航运规划提供参考

    This thesis hopes to offer the reference for hydropower cascade development and navigation planning in the Jinsha river.

    youdao

  • 水电梯级开发必然会导致水资源时空分布发生改变

    The hydropower cascade exploitation of a river basin inevitably causes the spatiotemporal distribution of water resource to change.

    youdao

  • 研究表明:水电梯级开发清江中下游地区植被覆盖环境影响比较大。

    The results indicate that the cascade hydropower development has significant impact on the vegetation environment in Qingjiang river basin.

    youdao

  • 虎跳峡水电金沙江中下游梯级龙头电站,该电站开发建设金沙江水电梯级开发“西电东送”的实施具有重要的战略意义;

    The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River.

    youdao

  • 虎跳峡水电金沙江中下游梯级龙头电站,该电站开发建设金沙江水电梯级开发“西电东送”的实施具有重要的战略意义;

    The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定