我们没有绘制甘特图,因为我们并不需要它。
进程(改变)导致不喜欢(会议或者甘特图)
单击此处可重命名所选甘特图。
图2:基于架构设计中重要元素之间依赖性的甘特图。
Figure 2: Gantt chart based on dependencies between architecturally significant elements.
甘特图显示活动顺序多久,每个人都应该采用。
Gantt charts show the sequence of activities and how long each should take.
使用甘特图、PERT图、策划树等工具策划项目。
Plan the project using tools such as Gantt chart, PERT chart, planning trees, etc.
甘特图形的优势是其简洁,便于准备和使用,且成本低。
The advantages of the Gantt chart are its simplicity, ease of preparation and use, and low cost.
当你以交付功能的方式度量成功时,绘制精美的甘特图就是你的指路明灯。
When you measure success in features delivered, your guiding star is the carefully crafted Gantt chart.
一种改进的甘特图,它具有能列出全部部门或者是特定的资源的能力。
A modified Gantt chart that schedules capacity by entire department or specific resources.
针对流水调度和作业调度给出了算法实例,并且绘制出了流水和作业调度的甘特图。
Give the arithmetic examples of flow shop and job shop, and show their schedule Gantt pictures.
介绍了网络计划技术的原理和网络图的绘制,并与传统的甘特图分析方法进行了比较。
The principle of network planning technique and network chart drawing method are illustrated and compared with Gantt chart analysis method in this paper.
该程序能产生正常情况下的调度时间表和甘特图,并能针对生产实际情况进行实时调度。
The program can be used to draw out the normal schedule time tables and their Gantt chart and applied to the real production system to make real time schedule.
该程序能产生正常情况下的调度时间表和甘特图,并能针对生产实际情况进行实时调度。
The programme can be used to draw up the normal time schedule and the GANTT, and to make real time scheduling in light of the actual conditions in production.
您可以想象他们这么做实际上是在构建一幅越来越详细的甘特图(Gantt chart)。
You can imagine them building up the Gantt chart as they go, filling in more and more detail.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
有时柱状图也被称为甘特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。
Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.
另外,他们通常用甘特图来衡量整个项目的进程,在甘特图上会显示已经完成了33%尚未完成66%,诸如此类。
In addition, they typically measure progress using Gantt charts that indicate the project is 33 percent complete, 66 percent complete, and so forth.
传统的项目管理工具,如PERT图、甘特图,都能清楚地显示各个作业之间的相互关系,也适用于合理安排作业执行的顺序。
The traditional project management tool, such as PERT and Gantt chart are used in activities sequencing. Those activities are independent with each other.
如果要将指定条形图绘在其他条形图之上,请双击“甘特图”上打开的区域然后在列表中将前景条形图移动到背景条形图的下面。
To set a particular Gantt bar to be drawn over another bar, double-click an open area on the Gantt Chart and move the foreground bar below the background bar in the list.
SVG图表组件通过读取多种数据源,如常见的数据库、XML文档,可以生成各种样式的图表,如饼图、柱状图、曲线图、甘特图等。
SVG chart components can produce varietious different kinds of charts, such as pie, bar, curve, gantt etc, by reading varietious data sources like common database, XML.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.