• 介绍P 3软件功能特点以及抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    youdao

  • 在对常规施工进度计划编制方法分析基础结合工程条件的特点,就进度计划编制技巧提出建设性探讨

    Based on the analysis for common methods of construction programme design with considering the new engineering condition, the author gives discussion on the skills of programme design.

    youdao

  • 模式项目进度计划系统整体出发着重强调并行项目之间相互协调编制步骤分为项目结构分解、项目活动时间估算计划编制

    The schedule in this pattern emphasized the harmonization of parallel projects based on the whole system, and its developing steps include structure analysis, estimation of time and planning.

    youdao

  • 模式项目进度计划系统整体出发着重强调并行项目之间相互协调编制步骤分为项目结构分解、项目活动时间估算计划编制

    The schedule in this pattern emphasized the harmonization of parallel projects based on the whole system, and its developing steps include structure analysis, estimation of time and planning.

    youdao