The paper introduces quality control technologies for concreting work, curing of beams, stretching and pressure grouting in the course of bridge precasting in the frigid plateau region.
介绍了高原高寒地区预制桥梁施工过程中混凝土施工、梁体养护、张拉压浆等的质量控制技术。
The technique of pier integral precasting at the sea was researched and applied in the innavigable section construction of Donghai Bridge(the first bridge at the sea in China).
海上墩柱整体预制吊装在我国第一座外海桥梁东海大桥非通航段施工中得以研究和全面应用。
应用推荐