The project installed brand new equipment on a large coal-fired power plant to capture 120,000 tons of CO2 each year.Dr.
这个项目是在一个大型的燃煤电厂里安装全新的设备,以期每年捕获12万吨的二氧化碳。
Bo when the success of the successful show to the Pingdingshan Coal Industrial Group at Bo and brand recognition of professional competence.
博时能够成功中标,显示平顶山煤业集团对博时品牌和专业能力的认可。
The project installed brand new equipment on a large coal-fired power plant to capture 120,000 tons of CO2 each year. Dr.
这个项目是在一个大型的燃煤电厂里安装全新的设备,以期每年捕获12万吨的二氧化碳。
应用推荐