This paper discusses the question of crane main girder camber and the pre-cambering curve, introducing camber values stipulated in related crane standards in China and abroad.
本文论述起重机主梁的上拱度及预拱曲线的基本原理,介绍了国内外起重机技术标准中规定的上拱度值。
To solve the problems of the multi-variables and multi-constraints in crane main girder optimization design, the paper proposes a new particle swarm optimization algorithm based on chaos series.
为了解决起重机箱形主梁优化设计中的多变量、多约束问题,提出了一种新的基于混沌序列的粒子群优化算法。
To install the crane span before installation, camber, level of metal structure of main girder bending, trolley rail height difference, gauge deviation, diagonal bridge survey.
安装前要对起重机安装跨度,金属结构主梁的拱度、水平旁弯,小车轨道高低差、轨距偏差,桥架对角线等进行测量。
应用推荐