The causes for the serious leakage of the reinforced concrete face dam of Zhushuqiao Reservoir are analyzed based on the design, construction and field measured data.
根据设计、施工和现场检测资料,分析了株树桥水库钢筋混凝土面板堆石坝严重渗漏的原因。
Using HDS-1 fast data flashing Rn measure instrument, the gas radon was measured in the active fault(zone)or broken zone and earthquake swell of the Wequan reservoir dam location.
采用HDS-1型快速数字闪烁测氡仪,对温泉水库坝址区活动断裂(带)或破碎带以及地震鼓包等进行了氡气测试。
In accordance with the measured data and the calculated result, the characteristics of the fluctuating pressures on the dam surface partitions are analyzed.
根据实测数据和计算结果,对坝面隔墙处脉动压力特性进行分析研究。
应用推荐