Numerical analysis about low embankment foundation response under traffic load was developed.
开展了交通荷载作用下低路堤高速公路路基响应的数值计算工作。
The result proved that the embankment foundation excavation was smooth and the houses nearby haven't any displacement and dropping appearance.
经实施,堤基开挖顺利,附近房屋无任何位移与沉降迹象。
High fill embankment foundation settlement calculations, without considering the construction process, the calculated results with field test results there is a big difference.
对高填方路堤地基的沉降计算,若不考虑施工过程,其计算结果与现场实测结果就存在很大的差别。
应用推荐