文章摘要信息 关键词 : 生产批量计划 多资源约束 蚁群算法 混合整数规划 [gap=985]Keywords : dynamic lot-sizing problem;multiple resource constraint;ant colony algorithm;mixed integer programming
基于14个网页-相关网页
Based on BAC algorithm, the optimization system of project network plan under multiple resource constraints is developed by Visual Basic 6.0. With the friendly input and output interface, to input, edit and assign activities and resources could be realized easily.
基于该算法利用VB6.0开发了多资源约束下的工程项目进度优化系统。
参考来源 - 多资源约束下工程项目进度优化系统的研究与开发·2,447,543篇论文数据,部分数据来源于NoteExpress
提出了多资源约束下的流程管理技术,解决了有限资源和工期之间的矛盾。
Put forward the technology of workflow management with multi-constraint of resource to resolve the contradiction between the limited resource and working period.
本文提出了用于求解单级多资源约束的生产批量计划问题的改进二进制粒子群算法,阐明了算法的具体实现过程。
In this paper, the improved particle swarm optimization algorithm for the single level capacitated dynamic lot-sizing problem is presented. The detailed realization of the algorithm is illustrated.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.