在所有的迭代过程中都执行系统测试的子集,即使每个迭代的系统测试时间都是有限的。
A subset of system test was performed throughout all iterations, even though the system test timeframe per iteration is limited.
这还让我们在把工作负载转移到新系统之前有时间测试595。
It also allowed us time to test the 595 before we unleashed any workload onto the system.
编写系统测试是个挑战,也需要大量的时间来实际地执行。
System tests are challenging to author and also take a good deal of time to actually execute.
应用推荐