...钢筋笼上浮;预防措施 [gap=226]Key Words: bored piles; the tube take water; pile a migration; reinforcing cage up-floating; prevention measures ...
基于1个网页-相关网页
作者认为只要在基桩施工中控制好其上浮因素,钢筋笼上浮事故是完全可以避免的。
The event of bar-mat reinforcement floating can be absolutely avoidable as long as its floating factor can be controlled well in the construction.
该文对导管堵塞、钢筋笼上浮、桩身缩径、断桩等四个质量问题从产生原因到防止措施作了具体叙述。
In this paper, 4 quality problems such as conduct blocking, rebar cage floating, pile body contracting, pile breaking etc are described from causes to prevention measures.
应用推荐