论建筑施工技术方案研究 - xzbu.com 中国论文网 关键词:技术方案;雨季施工;混凝土;吊装 [gap=855]Keywords: technology project; The rainy season construction; Concrete; hoisting
基于138个网页-相关网页
详细雨季施工安排如下: 雨季来临前作好施工现场和驻地哒排水、防护设施;
The concrete rainy season constructs the arrangement to be as follows: before rainy season approaches, finishes the job location and station draining water, the safe guard;
隧道位于岩溶地区,岩溶角砾岩、白云质灰岩在雨季施工时易产生坍塌、突水和突泥现象。
The tunnel site is located in Karstic area with limestones gravels, where is easy to cave in when construction in raining season.
还分别对炎热、雨季、冬季、夜间等特殊施工的技术措施做了介绍。
Also on the hot, rainy, winter night, and other special construction techniques and measures introduced.
应用推荐