ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.
摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。
Abstract: This paper aims to make a comparative analysis of different methods for project schedule performance prediction.
[摘要]对项目进度绩效预测方法进行比较分析。
Abstract: : whether the project can be completed on schedule mainly depends on whether the sluice cofferdam can safely pass through the flood season.
摘要:水闸围堰是否能安全度汛,是本工程按期完工的一个关键。