actual active power output curve 实际有功出力曲线
active power output limit 有功功率输出极限
active power output rescheduling 有功出力调整
output active power 输出有功功率
rated output active power 额定输出有功功率
System operation constraints are added into the optimization model of GENCOs' active power output.
在发电商有功优化输出模型中加入系统运行约束。
This model can take into account the realistic steady-state losses of STATCOM if desired, and hence more accurately predict the active and reactive power output of it.
该模型可以考虑STATCOM功率损耗从而可以更准确的计算其有功及无功输出。
This method has the advantages of no NDZ, high response speed and no influence on active power output of system. The simulation results validate the feasibility of this method.
分析结果表明,该方法具有检测无盲点、响应速度快以及对发电系统有功输出无影响的特点。
应用推荐