By the use of the actual measuring data, the designed lowest navigable stage of power plant downstream in mountainous river was analyzed and computed.
利用实测资料,对山区河流电站下游河段的设计低水位进行了分析计算。
At the same time, relying on the actual measuring data in this area, this work also studied the required rational sampling quantities according to the various measurement errors required.
并结合实测数据所表现出的变异特征来分析不同测量精度下的土壤电阻率测试样本合理容量。
Within your framework, include a method of capturing and measuring actual data from projects.
在框架内,包含捕获和测定项目的实际数据的方法。
应用推荐