No re-painting: Most bathroom alteration work results in repainting.
无需后补髹漆:多数卫生间改变工作结果都需要后补髹漆。
Design alteration isn't in the range of construction work quantity; supplied geological information, which doesn't conform to actual condition, has an influence on construction progress.
不属工程量清单范围内的设计变更;提供的工程地质资料与实际不符而增加工程量影响进度的。
Through the alteration of water, material unload system and the fabric of filtration, the optimization for coal and mud water system is achieved, work efficiency is raised highly.
通过对过滤机的卸水系统、卸料系统及过滤机滤布的改造,实现了煤泥水系统的优化,大大地提高了过滤机的工作效率。
应用推荐