aluminium bath smelting reduction 铝浴法熔融还原 ; 铝浴熔融还原
iron bath smelting reduction 铁浴熔融还原法
For the smelting reduction in iron bath, the foam should be kept in a suitable height in order to obtain a high rate heat transfer and reaction.
在铁浴熔融还原时,为保证较高的传热和反应速率,熔池中泡沫渣应保持一个适当的高度。
The effects of bottom blowing flow rate, top blowing flow rate and top lance level on mixed time in iron bath of smelting reduction furnace were studied with water modeling.
通过铁浴式熔融还原炉的水力学模型,实验研究了底吹流量、顶枪流量和顶枪枪位对熔融还原炉内混匀时间的影响。
Under high speed preheat in blast furnace and gasification in iron-bath for smelting reduction the pyrolysis of pulverized coal injection is the first important stage.
高炉喷吹煤粉和熔融还原铁浴粉煤气化等高速加热条件下,快速热分解是第一步。
应用推荐