The results indicate that the two factors, which are very important during operation of blast furnace and manufacturing of cooling stave, highly influence cooling capacity of cooling stave.
结果表明:这两个因素对冷却壁的性能都具有很大的影响,在高炉操作和冷却壁的设计制造中必须重视。
The lining structure with concentrated copper cooling plate-stave combined system for the large-scale blast furnace is the important guarantee of 18 ~ 20 campaign life.
大型高炉的密集式铜冷却板与冷却壁结合的炉衬结构是使高炉寿命达到18 ~ 20年的一项重要保证措施。
The finite element mould of the cast steel cooling stave of blast furnace was established and the initial conditions and boundary conditions were determined.
建立了高炉铸钢冷却壁的有限元模型,确定了冷却壁温度场模拟的初始条件和边界条件。