Connecting with smelting process of blast furnace, this paper analyzes on the damage cause of refractory material in every part of stove, and puts forward concrete preventive measures.
结合高炉冶炼的过程,分析了高炉各部位耐火材料的损毁原因,并提出了具体的防止措施。
The effects of various operating variables on smelting process in blast furnace were discussed using the energy management system .
利用这个系统,讨论了各项操作变量对高炉冶炼过程的影响。
Those demonstrated that the formed-model in this paper can basically interpret the process for the high lead slag smelting in blast furnace.
上述工作表明,本文所建立的鼓风炉还原熔炼模型能够较好的描述鼓风炉熔炼高铅渣的过程。
应用推荐