... building platform 建筑地台 building set back 将楼宇建筑位置移后 building status 楼宇性质 ...
基于52个网页-相关网页
The bad weather set back the building programme by several weeks.
天气恶劣,建筑计划延误了几个星期。
Set back in an area of the building that receives less natural light, raised wooden flooring defines a second space with tables for larger parties.
该建筑后面的一部分区域获得的自然光较少,架空木地板界定了第二个空间,这里有桌子,可以用作大的聚会。
Upper parts of the building structure had to be set back due to various legal limitations.
由于各种法律限制,建筑结构的上面部分必须往回收。
应用推荐