The spatial steel frame bearing construction loads and directly hanging formwork must be calculated by two stage design method recommended in this paper.
当需要采用空间钢构架承受施工荷载、直接悬挂模板时,应按本文建议的施工和使用两个受力阶段进行设计计算。
By means of the monitoring and detailed analysis for each construction stage, feedback controlling design is realized and the construction is controlled.
通过对各施工阶段的监测与分析,反馈调整和指导施工。
Displacing oil and water by gas is very effective, showing gas storage construction in late high water cut stage will have good gas injection and preservation capability.
天然气驱油和水的效果十分明显,说明高含水后期油藏进行储气库建设,其注气、储气能力较好。
应用推荐