Municipal roads are severely damaged, the main reason is that road base problem, for which cement stabilized soil base has been widely used in municipal engineering.
市政道路的路面破坏严重,最主要的原因就是路基基层的问题,为此, 水泥稳定性土基层已经广泛应用到市政工程中。
The cement dosage of the cement stabilized granular soil plays a very important role in the performance of road base course material.
水泥剂量对水泥稳定粒料路面基层材料性能的影响较大。
This paper states the whole course of construction of Xinming toad engineering using cement - stabilized soil as road base, includes sequence, methods and demands.
本文对新明路道路工程水泥稳定土做路面基础施工的全过程;
应用推荐