Though the improvement of manufacture technology of the modules welding between spire-wing tube and header for combined cycle heat recovery boiler, difficulty of the assembling was shortened.
通过对联合循环余热锅炉螺旋翅片管与集箱焊接的组件的制造工艺进行改进,降低了装配难度。
This paper analyzed the problems existing in the commissioning of heat recovery boiler and steam turbine in a175MW gas-steam combined cycle generating unit and put forward the improvement proposals.
针对某175MW燃气-蒸汽联合循环机组中余热锅炉和蒸汽轮机调试存在的问题进行分析,提出改进意见。
Described is a method of superheated steam regulation for the heat recovery boiler of a gas steam combined cycle power plant, the so called boiler drum saturated steam attemperation.
介绍了燃气—蒸汽联合循环电站余热锅炉过热蒸汽调温的一种方法—自身饱和蒸汽减温。
应用推荐