For a single, small project with a maximum of seven employees on the construction team, this role would add little value.
对于一个最大只有七个员工团队的单一的、小的项目,此角色不会增加什么价值。
The Lifecycle architecture milestone establishes a managed baseline for the architecture of the system and enables the project team to scale during the Construction phase.
生命周期体系架构里程碑为系统的体系架构建立了一个受控的基线,并令项目团队在构构建段进行测量。
Due to the technical complexity of the project, the team elected to site-build the structure, but the value of the design approach was evident in the efficiency of construction.
由于项目技术的复杂性,建筑师挑选团队在基地进行结构的建造,但是设计方法的价值也体现在施工的效率。
应用推荐