先进先出去 first-in,first-out缩写FIFO 在发建工程 constructions in process 固定资产更换与固定资产改良 improvements and replacements of fixed assets ..
基于154个网页-相关网页
本文摘要:在发建工程(constructions in process) 尚未落成的固定资产的成本和大补缀、更改造工程的成本拜见“资产评估”我国管帐轨制划定,固定资产落成并办理决算后
基于56个网页-相关网页
·先进先出去(first-in,first-out缩写fifo) ·在建工程(constructions in process) ·固定资产更换与改良(improvements and replacements of fixed assets) ..
基于20个网页-相关网页
Simultaneously, the safety of adjacent constructions in the process of tunnel blast excavation based on the monitoring result is analyzed to provide corresponding safety criterion.
同时对隧洞爆破开挖过程中邻近建筑物的安全,根据实际监测成果作了进一步分析,给出了相应的爆破安全判据。
Two control constructions are adopted for in the system, the directly controlling class (front machine) and the process managing class (center control machine).
系统采用直接控制级(前沿机)和过程管理级(中心控制机)二级控制结构。
Constructions of the decision process principles is clarified according to economic, can lead to an efficient distribution resource allocation in SCM.
证明在一般经济原则指导下设计的决策过程结构可以带来供应链管理中分布式资源的有效分配。
应用推荐