高层塔吊基础设计及施工安全管理要点分析_建筑工程管理论文 关键词: 塔吊基础设计,顶升作业,塔吊拆除 [gap=380]Keywords: crane foundation design, roof up assignments, crane demolished
基于12个网页-相关网页
The construction unit when the tower crane foundation, must ensure that the endurance meets the design requirements, the strength of reinforced concrete at least the design value of 80%.
施工单位在做塔吊基础的时候,一定要确保地耐力符合设计要求,钢筋混凝土的强度至少达到设计值的80%。
Unreasonable design project can arose the capsizal of tower crane in building its base on soft soil foundation, and it will also increase the construction cost.
在软土地基中建造塔吊基础,设计方案的不合理会引发塔吊倾覆的安全事故,或加大了项目成本。
应用推荐