... cut 割切 cut and cover method 锄坑回填法;明挖回填法 cut and cover tunnel 挖填方式开始建筑的地道(明挖式地道) ...
基于258个网页-相关网页
... 无缝线路断轨力 breaking force of continuous welded rail 明挖法 cut and cover method 盖挖顺作法 cover and cut-bottom up method ...
基于62个网页-相关网页
Cut t and cover method 明挖覆盖法
Cut and cover reverse method 盖挖逆作法
cover and cut method 盖挖顺作法
cut-and-cover tunnel construction method 隧道开挖施工法
cover and cut-top down method 盖挖逆作法
To this end, this thesis proposes a construction program based on the developed shield tunnel with combination of cut and cover method of construction of subway station.
为此,本文提出了在已建成的盾构隧道基础上,结合明挖法修建地铁车站的施工方案。
As the building environment at metro station is complex, cover and cut method should be chosen at first for the large - scaled metro station.
地铁车站所处的建筑环境极其复杂,对于多层多跨的大型综合性地铁车站一般应首选盖挖逆作法施工。
At present, construction methods of metro station include cut and cover, NATM, shield driven method and their combination and changing forms at home and abroad.
目前国内外修建地铁车站的施工方法有明挖法、新奥法、盾构法和这三种方法的组合及变化形式。
应用推荐