concrete dam pouring [水利] 混凝土坝浇筑
An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established.
对三峡工程泄洪坝段混凝土通仓浇筑,建立了模拟混凝土施工过程的整体模型。
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouring dam construction in GongBoXia project.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
So it is necessary to carry out risk analysis and risk management in pouring dam construction to display the virtues of concrete faceplate rock dam and to construct quickly.
因此,要发挥堆石坝的优势,做到快速施工,有必要针对具体的工程进行一定的风险分析与风险管理。