On the basis of analysing storm flood characteristics of Qinjiang River, the method and main results of design flood calculation for Gaobazhou Project are presented.
在分析清江暴雨洪水特性的基础上,介绍了高坝洲水利枢纽设计洪水计算方法及其主要成果。
Design Basis Flood Level is one of the important parameters in nuclear power plant siting in coastal area, and evaluation for storm surge is the main factor of Design Basis Flood Level.
设计基准洪水位是滨海核电厂选址中的重要参数之一,而风暴潮评价又是设计基准洪水位的主要组成因素。
With the new method, the flow variation curve of each inlet can be easily obtained, giving a basis for the design flow of storm pipelines.
利用新方法可模拟求得各集水口入流水流变化曲线,为准确确定雨水管道的设计流量奠定了基础。
应用推荐