The system has evaluation model resetting, evaluation process leading, evaluation knowledge supporting and so on.
基于1个网页-相关网页
Leading evaluation method into design process, the generation strategies of well-constrained VGCN is discussed, and the theories of variational geometric constraints network are established.
并将该评价方法引入设计过程,研究完全约束的变动几何约束网络的生成策略,从而建立了变动几何约束网络理论。
Quality Department: Participating subcontractor audit process, leading subcontractor quality system evaluation and subcontract parts quality inspection and verification.
质量部:参与外包商的审核,主导外包商的品质保障评价,外包产品质量的检验与验证。
Technical Department: Participating subcontractor audit process, leading subcontractor technical aspect including equipment evaluation. Providing technical support to subcontractor, if necessary.
技术部:参与外包商的审核,主导外包商的技术能力与设备的评价。必要时,提供技术支持给予外包商。
应用推荐