In the due time, the professional engineers will take part in the ex-works test, the check and accept of the equipment.
在适当时候,专业工程师将参与设备的出厂试验以及开箱验收工作。
The equipment in the contract supplied by the Seller must undergo the ex-works quality inspection, examination and test run and be delivered with quality certificates.
合同中所规定的由卖方提供的设备必须经过出厂前的测试和检验,并带有质量证书。
Prior to ex-works, equipment is subject to optimal design and production, as well as 72-hour running test as required by the customers, which can meet the special requirements of different customers.
设备在出厂前均根据客户需求,经过最佳优化设计、生产制造、72小时运转测试,保证满足不同客户的品质与特殊要求。
应用推荐