Yushugou reservoir project is built in our country, it is the first overfall Concrete Face Rockfill Dam (CFRD) which has been carried out flood discharge.
榆树沟水库工程是我国建成并过流的第一座溢流混凝土面板堆石坝。
The concrete face rockfill dam has been designed by the design institute at left abutment of Tongjiezi project to suit the unfavorable geologic conditions.
为适应铜街子工程左岸的不利地质条件,设计单位在左岸设计了砼面板堆石坝。
The seepage field and stability of concrete-faced rockfill dam in Banduo Hydropower Project, when vertical joint inactivation are occurred to the face plate, are calculated by FEM method.
以班多面板堆石坝为例,用有限元方法计算了当面板缝局部失效时各种工况下的渗流场,系统分析了大坝在面板垂直缝局部失效后的稳定渗流场的规律和特点。
应用推荐