Then the forward calculation is also used to get the tensile cable forces of the construction process to gain a finished bridge state under the control of the former forces.
再以此索力作为正装计算的控制张拉索力,通过正装计算得到一个成桥状态。
The structural analysis for perfectly finished state and reasonable construction state of cable-stayed bridge is the focal and key point of the design.
斜拉桥理想成桥状态与合理施工状态的结构分析是其设计的重点和难点。
Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.
独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。