Based on the continuing interpolation grid of the roof and floor of coal seam, a new resolution to fault is put forward on 3d visualization deposit modeling.
基于煤层顶、底板的整体插值,实现了对三维可视化矿床模型的断层处理。
The hard-and-thick strata ACTS both as the floor of coal seam No. 7 and as the roof of coal seam No. 9 in Zhangshuanglou coal Mine; and coal seam No. 9 is also hard.
张双楼煤矿主采煤层为7煤和9煤,两层煤之间赋存唯一一层厚硬岩层,即9煤层的直接顶也是7煤层的直接底。
Finally, we have presented some opinions for Water inrush mechanism at the floor of Coal Seam and have proposed a new method for strengthening the resistivity against dynamic load.
最后,对煤层底板的突水机理提出了一些见解,并且,提出了一种加强底板抗动载能力的新方法。
应用推荐