Under complicated conditions, a building was partially demolished through controlled blasting. Mechanical pre-cutting was carried out before the building was collapsed by folding directional blasting.
在复杂环境条件下对一楼房进行保护性部分爆破拆除,采用机械预切割、折叠定向爆破倒塌的控制拆除方案。
The directional folding blasting for demolishing a high brick water tower in the complicated surroundings is introduced.
介绍了复杂环境中砖砌高大水塔的定向折叠爆破拆除。
A gymnasium stadium with a "Z-shaped" framework structure was demolished using the dual directional folding controlled blasting technology.
采用双向折叠控制爆破技术拆除了一座“Z”型框架结构的体育场看台。
应用推荐