Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.
采用沿脉布置的无底柱分段崩落法,当矿体底板倾角不足时,需要在下盘岩石中开掘进路。
The vertical and parallel relations of the trench with drill drift are summarized by the bottom structure disposal design on inclined orebody footwall.
通过对倾斜矿体下盘底部结构的设计,总结了堑沟与凿岩巷道在垂直与平行位置关系,经比较和验算后合理设计底部结构,减少了开采损失贫化。
应用推荐