Two kinds of representative CC-Repowering (feed water heating repowering, full firing repowering) are study in this paper. The concise performance expressions and typical data are analyzed for the combined cycle and for repowering the existed steam power station.
本文针对两种典型的联合循环系统(排气助燃型和给水加热型)进行了研究,给出了这两种联合循环及其在用以增容改造已有的蒸汽轮机电厂时的性能简明示式和典型数据。
参考来源 - 利用燃气—蒸汽联合循环改造老电厂的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The room was full of journalists, all firing questions at them.
满屋的记者向他们接二连三地提问题。
The first full test firing of the rocket that will power a British car to over 1, 000mph (1, 610km/h) will take place in the coming months.
在接下来的几个月中,一辆通过火箭驱动的英国汽车将进行超越 1000mph(1600km/h)速度的完整测试。
A full-scale prototype of the Long March 5 rocket would be ready for testing in 2012 and a year later, test firing of fully assembled rocket stages would be conducted.
长征- 5号火箭的全面原型准备在2012年和以后1年内进行测试,各级完全组装完成后,火箭的发射测试也将进行。
应用推荐