full scale load test 满刻度载荷试验
For a thermal power generating set, the automatic adjustment of water supply during operation under low load is always the bottleneck for the realization of full-scale water supply automatic control.
火力发电机组低负荷运行阶段的给水自动调节一直是实现全程给水自动控制的一个难点。
The combined load cases were encountered which were not suited for working of fatigue machine during simplification of simulative specimens which were simplified from the full scale titanium frame.
由全尺寸框向模拟试件简化过程中 ,遇到复合载荷工况 ,而这种复合载荷不适合在疲劳机上进行加速试验。
Load control system is very important for UHV tower full-scale tests.
荷载测控系统在特高压杆塔真型试验过程中起着至关重要的作用。
应用推荐