By improving the fully mechanized light caving technology, carrying out in the 1426d working face light caving practice, achieving the goal of safe production.
通过改进综采轻放工艺,在1426d工作面进行综采轻放开采实践,实现了安全生产目标。
In the light of analogue test in laboratory, the stability of roof of fully mechanized working face with top coal caving is studied during withdrawing support at stop line.
通过实验室相似模拟试验,对综放面收尾撤架空间的顶板稳定性进行了研究。
应用推荐