... aswan high dam 阿斯旺水坝 high dam construction 高坝建设 Aswan High Dam is completed 历史上今天埃及阿斯旺水坝竣工 ...
基于12个网页-相关网页
To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.
理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。
It provides important reference for Longtan high RCC dam design and construction.
为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。
Simulation of hydraulic fracturing of rock mass is an important issue in the construction design of high dam and deep-lying tunnel and so on.
岩体水力劈裂模拟是高坝、深埋隧洞等工程施工设计中的重要问题。
应用推荐