In case of underground construction in area of high ground water level, there is often anti-floating problem during the work.
在高地下水位地区进行地下工程施工,往往存在工程的抗浮问题。
The foundation pit for the parking building of the capital Airport has a large area, a profound depth, complex geological conditions and rather high ground water level.
首都国际机场停车楼基坑面积大,深度深,地质条件复杂,地下水位较高。
Due to the ground water situation coming from the Donau and the slight subsidence of the property to the street level, it was clear that the goal would be to build as high as possible.
由于来自多瑙河的地表水和土地的轻微沉降至街道水平,很明显建筑物应该建得尽可能高。
应用推荐