The paper introduces the construction technique, construction process and quality control on key tache for the! Prestressed hollow beam of Tongmi Bridge.
介绍垌利大桥预应力空心梁的施工工艺、施工程序、重要施工环节的质量控制。
Besides, through the analysis and contrast of the theoretical results and measured ones, the nonlinear deformation and failure behaviors on the hollow slab beam were discussed.
此外,通过该梁的非线性计算结果与实测结果的分析对比,对预应力混凝土空心板梁的非线性破坏规律进行了有益探索。
Combined with the engineering practice discussion is made on the construction technology and the process for the centralized prefabrication of prefabricated prestressed hollow girder beam.
结合工程实例介绍了装配式预应力空心板梁的集中预制的施工组织及工艺流程。
应用推荐