The Pulverized Coal Injection of Blast Furnace has won praise prize of Excellent Reconnaissance and Design of Project from the Guangzhou Construction Committee in 1998.
广钢高炉喷煤工程1998年获广州市建委优秀工程勘察设计表扬奖。
Coal injection of blast furnace is an energy-save and consumption-reduction project and a set of reliable automatic control system has an important function on continuous and stable coal injection.
高炉喷煤是个节能降耗项目,一套可靠的自动控制对于连续、稳定的喷吹起着重要的作用。
Under high speed preheat in blast furnace and gasification in iron-bath for smelting reduction the pyrolysis of pulverized coal injection is the first important stage.
高炉喷吹煤粉和熔融还原铁浴粉煤气化等高速加热条件下,快速热分解是第一步。
应用推荐